Thursday, 14 April 2016

Control Phase Blog

Containment to Prevent Automotive Steering Column Electrical Failures

Control Phase

Date: 17 April 2016

Introduction 

Following installation of the second Nordson conformal coating machine into the line to improve our process by adequately coating the Hall IC components in the steering column electronic, it was necessary to put controls in place to ensure that the process continues to work well and maintain high quality levels. These consisted of the following,
         ·         Establishing workmanship standards for Dam and Cure Gel
         ·         Establishing process parameter standards for Dam and Cure Gel
         ·         Establishing preventative maintenance frequency and activities on both conformal coating                        machines.                    
         ·         Establishing a method of checking Dam and Cure Gel thickness
         ·         Co-ordinating training for technicians and operators in Dam and Cure Gel introduction on series              production line
         ·         On line flip chart for daily hourly ppm reviews live
         ·         Daily line meetings to review performance and identify issues
         ·         Weekly meeting with team
         ·         Quarterly formal meeting with operators and technicians to appraise performance

       All these controls should ensure the success of the introduction of an additional step in our process ie the  Dam and Cure  Gel application and should ultimately lead to our goal of a 95% reduction in field failure  as a result of  foreign metal debris causing shorts in the steering column electronic. This would equate  with a financial  saving of approximately €132,500 , a blue sky reduction of 100% would equate with a  financial saving of approximately €137,800. We will not be able to fully investigate and quantify the exact  reduction in associated field failure and the cost savings incurred until a full year has elapsed. 














Thursday, 31 March 2016

Improve Phase Blog

Containment to Prevent Automotive Steering Column Electrical Failures

Improve Phase

Date: 3 April 2016

Introduction 

Due to the failure of our DoE2 samples at Thermal Shock Endurance Testing, it was necessary with immediate effect to come up with an alternative solution to our containment issue. It was proposed as a team that we consult with the supplier of our existing coating material, explain our problem and seek any advice they may have. It was brought to our attention that other customers of theirs had used a new type of material , a Dam and Cure Gel, to help overcome similar issues. This was to be trialled immediately, initially using a hand dispenser as we did not have the correct applicator in our existing conformal coating machine for this material. A revised Gantt Chart was created to schedule all tasks involved in the delivery of the newly proposed process trial.
Revised Gantt Chart
The trials involved three different methods of Dam and Cure Gel application
       1. Hall IC coated with Dam and Cure Gel only
       2. Hall IC coated with Dam and Cure Gel first, then coated with our normal Himiseal UV 40-250
           conformal coating
       3. Hall IC conformal coated with Humiseal UV 40-250 first, then coated with Dam and Cure Gel.
Initial inspection of the hand trials showed a marked improvement in the coverage of the Hall IC's . It was clearly evident that the samples with the Gel placed last gave far superior results as there was complete coverage and better adhesion to the printed circuit board due to it being placed on top of a lower viscosity material. The coverage was put to the test by placing metal debris on top of the coated Hall IC, which was proven to be well protected. These were then sent to our Validations Department for visual inspection and Thermal Shock Endurance Testing.


Metal Debris test on Gel coated Hall IC
Gel location on printed circuit board

When eventually we received the results from the Validations Department, it was worth the wait . All parts had passed validation and we could now progress with automating the process by installing a second Nordson conformal coating machine inline with our existing one. The original machine would not have been capable of applying two different materials. A provisional order has been generated for the new machine at a cost of €76000 and delivery should be in house within two weeks . 

Section of Validation Report for Dam and Cure Gel samples
A layout proposal incorporating the new Nordson Coating machine into the existing line has been generated and plans for actual installation have been drawn up.


Existing Layout Schematic

Proposed Layout Schematic
A risk management plan was put in place to foresee risks, estimate impacts and define responses to issues as a result of the relayout. It also contains a risk assessment matrix. A risk is defines as "in uncertain event or condition that, if it occurs, has a positive or negative effect on a project's objectives. The resultant risk profile is a quantitative analysis of the types of threat the proposed line changes are exposed to.
Risk Assessment Matrix

Process and Equipment Layout Comparison

Risk Profile Evaluation
The Risk profile has been reduced from a rated risk of 69 to 37 through the use of mitigating actions. The Risk Profile is now deemed acceptable by the project team.

Wednesday, 9 March 2016

Analyse Phase Blog

Containment to Prevent Automotive Steering Column Electrical Failures

Analyse Phase

Date: 13 March 2016

Introduction 

Following on from our measure phase where we did a CMK evalution of our conformal coating machine to ensure that our process was capable and secondly a Design of Experiments (DoE) to ensure our process was operating at its optimum settings, we set about analysing the results.
Results of CMK analysis.
              X value   2.2333
              Y value   2.0872
               Z value   3.6545
CMK, also called initial process capability, was measured using 50 continuous samples produced on our machine, keeping all influences other than the machine parameters constant, ie operator , measuring equipment, etc. Formula for calculating CMK is the same as CPK, but here we need to use standard deviation calculation for the 50 data values obtained. Stability is verified by plotting this on a control chart to look at whether the process is stable or not. As our CMK values were greater than 1.67 which is the automotive industry specification, the machine was proven capable and the data also proved our process is stable as no data values are outside the control limits and also satisfy the other process stable criteria.
Results of DoE analysis.
Following on from the measure phase where the array of runs generated by Minitab software, using all variable factors at their high and low settings (See Table2 DoE1 Measure phase) were completed and presented for analysis. The key responses namely (1) Quantity of Bubbles were visually inspected and rated from 1-best to 10-worst , (2) Wet Thickness measured using a wet thickness measuring device (microns),
(3) Coverage of Conformal Coating rated from 1-best to 10-worst and (4) Width of strip measured using a calipers.
The results were analysed using Main Effects graphs generated by Minitab. See Figures 16-19



It is evident from Figures 16-19 above that three process variables have a significant effect on the key responses, the slope of the line being the significance indicator , ie no slope , no effect .
The process variables are
         1.Fluid pressure (psi)
         2.Height of nozzle above pcb (mm)
         3.Micro adjust (mono)
A susequent DoE2 was to be designed using only these significant variables , all other variables remaining constant, and a trial conducted using the array of runs generated by Minitab in Table4.


A total of 27 test boards were produced as per Table4 above and these were then sent to our Validations Department where they were assessed by means of a Thermal Shock Endurance Test. The test subjected the parts to extremes in temperature from -40 degrees Celsius to +85 degrees Celsius, a duration of 30 minutes at each temperature .The parts were assessed for visual deterioration during and after the tests at intervals of 250 cycles, 500 cycles, 750 cycles and finally 1000 cycles. The key responses mentioned above were also inspected.

Fig 20. 

It is clearly evident that after only 250 cycles of Thermal Shock Endurance Testing that we had a very high failure rate from our trial boards using the optimum settings derived from our Design of Experiments. At stage it became apparent that our existing process was not capable of achieving our requirement of adequately coating the Hall IC leads in order to prevent short circuits from the metal debris in the steering column assembly. This left us with no other alternative but to look at another means of solving our conformal coating issue. This will be discussed in the next phase of the DMAIC process.







Saturday, 20 February 2016

Measure Phase Blog

Containment to Prevent Automotive Steering Column Electrical Failures

Measure Phase

Date: 21 February 2016

Introduction 

The first step we undertook as a team was to measure the number of field failures annually as a result of electrical failures in the steering column electronic(SCE). These failure were as a result of foreign metal debris causing short circuits in the SCE.

At an average cost saving of  5300 per field failure , any reduction of same would have a significant cost saving for our company .
         Because of the issues we were having with insufficient conformal coating on our SCE , it was decided to carry out a CMK evaluation on our Nordson coating machine .Analysis of CMK will be performed in the next phase of the DMAIC process, ie the Analyse Phase. CMK was measured using 50 continouous samples produced on our machine , in this case the X, Y and Z axes, keeping all influences other the machine parameters constant. The data was then input into Minitab software to calculate the CMK values for each axes . The industry specification is a CMK value of greater than or equal to 1.67 . CMK values greater than this value indicate that the machine is capable and also that a stable process is achievable .













The most significant part of our Measure Phase was the Design of Experiments(DoE) we carried out to determine the optimum levels for all variables of the conformal coating process, thus giving best possible results, namely sufficient coverage with no delamination (splitting or separation into layers), cracking or bubbles.

The first stage of the DoE process was to screen out the significant variable.See Table2. All machine variables were listed at their low and high settings and the results entered into Minitab software.This generated an array of runs for us to complete (DoE1)and present for analysis. See Table3. The aim of this Design of Experiments is first to identify the significant variables by means of our screening method in DoE1 and secondly to provide an understanding of the significant variable settings and the effect they have on each other. DoE analysis will also be carried out in the next stage of the DMAIC process , ie the Analysis Phase.
Both tools , ie CMK and Design of Experiments were invaluable to us as a team in order to first prove that our machine was capable and also that it was being operated at optimum settings.






Saturday, 6 February 2016

Define Phase Blog

Containment to Prevent Automotive Steering Column Electrical Failures

Define Phase

Date: 7 February 2016

Introduction 

The aim of this project is to put a containment in place to prevent foreign metal debris in a steering column assembly causing short circuits on the steering column electronic. The issue the team are focusing on is one related to several field failures as a result of shorts within the steering column electronic (SCE). Detailed analysis and investigation revealed that the root cause was determined to be foreign metal debris from the steering column assembly which was attracted in particular to the two Hall IC's on the electronic. Their close proximity to magnets located on the bottom side of the printed circuit board was the main reason for this.The Hall IC's have conformal coating protection applied to them, however this was not sufficient, primarily on the bend of the leads to protect against metal debris causing shorts. Hence the need to come up with a containment solution as soon as possible to prevent further field failure, and also to ensure that this design flaw would not reoccur in any future redesigns.
Conformal coated Hall IC's                    Metal debris short across Hall IC
The first step in the Six Sigma process was to form a project team , the one chosen was one individual from each relevant department ; each would bring invaluable knowledge and experience to the table.
The next step was to create a project charter which was an invaluable tool in that it gives a simple
overview of the complete project from start to completion .

Project Charter
A SIPOC diagram was generated to chart the process flow of product through the conformal coating stage .

SIPOC diagram
Subsequently , I went on to hold a brainstorming session with the team members to go through the potential causes of the lack of conformal coating in the steering column electronic(SCE).From this information I then created a Cause and Effect diagram to visually display all potential causes of this problem. I found this an exceptional tool for organising all the possible causes of a known effect in a clear and organised way .I also found the brainstorming session itself to be a very positive experience as it gave much more insight into the process than I would have previously encountered .

Cause and Effect diagram
A Gantt chart was formed to display project milestones ie define, measure, analyse, improve and control in a much more visible format. This six sigma tool also helped identify all essential tasks and whether they could be performed parallel to each other or had to be performed sequentially .

Gantt Chart